DW Hammer was able to perform the renovation of VW Credit Center's data center while working through various successful method of procedures (MOP). This project included furnishing and installing (2) 750 KW generators including all associated switchgear, isolation ATS's, UPS's, PDU’s, and commissioning of the existing electrical distribution. There was also a substantial renovations of the existing data center with all work being performed in a "live" data center environment. The turnkey team was able to obtain significant resale values for VW's generators, was able to procure a 2N UPS solution for the same cost as N+1 UPS solution, with all savings going back to VW Credit.
Project Type:
Mission Critical
Client:
VW Credit
Completion Date:
2016
Project Size:
100,000 Square Feet
Location:
Libertyville, IL