The project includes a 46,000 square-feet buildout of high end space for an engineering design function. The space is comprised of 50% of open ceiling plan and the other 50% is corporate space.
Included are a large multipurpose room, boardroom, reception area and several conference rooms. There is an extensive, state of the art audio/visual installation, which makes the space extremely functional and contributes to the efficiency of the ESD staff. The space includes the entire 53rd floor and a portion of the 54th floor.
DW Hammer worked alongside with ESD from the initial design phase, and throughout implementation. The DW Hammer & ESD Team purchased all of the major materials and equipment from the suppliers-direct, which saved over 10% on major material-costs, and ultimately came in under the building tenant improvement allowance given in ESD's original lease-terms. Over $630,000 in cost savings were given back to ESD.
Project Type:
Interior Buildout
Client:
Environmental Systems Design, Inc.
Completion Date:
Early 2019
Project Size:
56,000 Square Feet
Location:
Chicago, IL